← All projects

Civil · regional · NDA

Regional civil infrastructure, off-grid and reliable.

A multi-camera install on a regional infrastructure site with no mains power and patchy 4G — built to run unattended for the life of the project.

Regional civil infrastructure, off-grid and reliable.

Location

Regional NSW

Duration

18 months

Cameras

3 off-grid camera systems with solar + cellular redundancy

Client

National civil contractor (under NDA)

The story

Connectivity, power and weather were the brief. The site sat 40 minutes from the nearest town, with no mains power and one carrier that worked some of the time. We specified a solar/battery rig, dual-SIM failover, and a monitoring setup that flags drops before the client notices.

Across 18 months we made two scheduled site visits. The cameras kept running through a heatwave, a flooded access road, and a six-week shutdown.

Outcome

A complete visual record of the build — used by the contractor in submissions, by the government partner in public updates, and as the closing sequence in the project's completion video.

Have a project worth documenting?

Tell us about the build, the timeline, and what you need at the end. We'll come back with a plan that fits.

Back to home ›